Topic
Datacenter Power
MW-scale power for AI clusters: where the electrons come from.
- Market Size
- —
- CAGR 28.0% (3y)
- Companies Tracked
- 6
- Business Signals (90d)
- 0
- Avg Fit Score
- 74/100
This Week
Lead story
Behind-the-meter SOFC + gas turbines are now the default path around 5-7yr utility interconnect queues for 50-200MW AI campuses (Bloom 7ee2bd4f, GE Vernova bb99bbf8, products module May 2026).
The chip shortage is over. The new shortage is a substation — and hyperscalers just stopped waiting.
Read full strategy →Modules
Top Companies by Fit Score
Recent Hiring (top specialties, 90d)
- power distribution8 roles
- grid interconnect7 roles
- power electronics5 roles
- busway3 roles
- medium voltage switchgear3 roles
Jobseeker Personas
POWER-GRID-LIAISON-01
Utility / grid liaison managing PPA + interconnect timelines for hyperscaler AI loads.
POWER-FACILITY-ENG-01
Hyperscaler facility engineer evaluating power-systems vendors for 50-200 MW AI campus builds.
POWER-RELIABILITY-ENG-01
Reliability engineer focused on backup / standby power for 99.999% AI workload SLA.
POWER-VC-ANALYST-01
Investment analyst covering datacenter-power capex cycle (utility + AI-driven).
Tools
Subscribe to weekly updates on Datacenter Power
One email Friday morning. Engineers only.
Subscribe to aiinframap Weekly →