{"slug":"datacenter-buildout","title":"Datacenter Buildout","tagline":"Site selection, construction lead-times, and the 18-month bottleneck.","hub_url":"/topic/datacenter-buildout","counts":{"companies":6,"business_signals_90d":11,"talent_signals":123,"jobseeker_profiles":5,"fit_scores":0},"companies":[{"slug":"compass-datacenters","name":"Compass Datacenters","primary_layer":"L1","description":"Build-to-suit hyperscaler datacenters. Brookfield + Ontario Teachers backed. Single-tenant 50-200 MW campuses; tracked in any \"who is building for hyperscaler X\" question.","profile_url":"/companies/compass-datacenters"},{"slug":"stack-infrastructure","name":"Stack Infrastructure","primary_layer":"L1","description":"DigitalBridge-owned hyperscale builder; APAC + EMEA + Americas footprint. Pre-power-secured land bank the operational moat.","profile_url":"/companies/stack-infrastructure"},{"slug":"aligned-data-centers","name":"Aligned Data Centers","primary_layer":"L1","description":"Liquid-cooled hyperscale build prime. Adiabatic + immersion deployments at scale. Macquarie-backed. Energy-efficiency narrative differentiator vs traditional REIT colo.","profile_url":"/companies/aligned-data-centers"},{"slug":"iron-mountain","name":"Iron Mountain","primary_layer":"L1","description":"Records-management pivot to datacenter REIT. Frankfurt / Virginia / Phoenix datacenter campuses. Hyperscaler-class pipeline disclosed; underweight vs DLR / EQIX but growing fastest.","profile_url":"/companies/iron-mountain"},{"slug":"spacex","name":"SpaceX","primary_layer":"L8","description":"Operator of the xAI Colossus 100K+ GPU cluster site (Memphis TN) and Starlink ground-station systems; xAI training-compute provider; first external Colossus customer = Anthropic (May 2026). Expected June 2026 NASDAQ listing ($SPCX).","profile_url":"/companies/spacex"},{"slug":"coreweave","name":"CoreWeave","primary_layer":"L5","description":"AI-infrastructure neocloud peer; the public-comp reference for SpaceX/xAI compute-as-a-service positioning ahead of the IPO.","profile_url":"/companies/coreweave"}],"generated_at":"2026-07-05T09:04:09.100Z","personas":[{"segment_id":"DATACENTER-EARLY-01","one_liner":"An early-career engineer (0-3 years) eager to master the intricacies of hyperscale datacenter construction and operations, particularly advanced power and cooling systems, and accelerate their learning curve in this specialized field.","url":"/topic/datacenter-buildout/personas/DATACENTER-EARLY-01"},{"segment_id":"DATACENTER-SENIOR-01","one_liner":"A senior professional (3-10 years) in datacenter construction or operations, driven by the desire to join a rapidly expanding hyperscale or AI-infrastructure builder and contribute to high-impact projects, seeking significant career advancement.","url":"/topic/datacenter-buildout/personas/DATACENTER-SENIOR-01"},{"segment_id":"DATACENTER-STAFF-01","one_liner":"A highly experienced staff or lead professional (10+ years) with deep expertise in complex datacenter project delivery, such as power procurement or large-scale construction, seeking top-tier compensation and equity for their specialized, high-impact contributions.","url":"/topic/datacenter-buildout/personas/DATACENTER-STAFF-01"},{"segment_id":"DATACENTER-SENIOR-02","one_liner":"A senior operations or facilities manager (3-10 years) prioritizing long-term job security and a predictable work environment within a financially stable datacenter provider, seeking to avoid the volatility of startups or unproven AI-infrastructure technologies.","url":"/topic/datacenter-buildout/personas/DATACENTER-SENIOR-02"},{"segment_id":"DATACENTER-EARLY-02","one_liner":"An early-career site engineer or operations technician (0-3 years) focused on finding a supportive and collaborative team environment within a datacenter company, where strong values and mentorship foster a positive and inclusive workplace culture.","url":"/topic/datacenter-buildout/personas/DATACENTER-EARLY-02"}]}