{"company":{"slug":"vertiv","name":"Vertiv","legal_name":"Vertiv Holdings Co","aliases":["Vertiv","VRT"],"primary_layer":"L1","primary_topic_id":"optical-modules","secondary_topics":null,"hq_country":"US","hq_city":"Westerville","founded_year":2016,"is_public":true,"ticker":"VRT","description":"Power + thermal infrastructure for hyperscale + colocation data centers. UPS / switchgear / busway / rack PDU / liquid cooling. The most-mentioned name on hyperscaler datacenter capex commentary."},"profile":{"snapshot":"Power & cooling vendor riding AI capex: $8.5B record backlog, NVIDIA 360AI GB300 reference partner","stack_layer":"L1","why_join_top_2":["Demand is contractually visible, not speculative: Q3 2025 record backlog ~$8.5B and FY2025 guidance raised toward ~$10B (29% YoY growth) — power/UPS roadmaps are funded years out (signal c763ccd4).","Work directly on NVIDIA's frontier roadmap: named 800 VDC ecosystem partner for 1 MW+ racks (May 2025) and shipping 360AI designs for GB300 NVL72 at ~142 kW/rack (signal 0a8f1612), aligned to Rubin 2027."],"peer_comparison":{"substitute":{"name":"Bloom Energy","delta":"Bloom's behind-the-meter fuel cells bypass 5–7yr grid-interconnect queues, displacing the utility-fed power Vertiv conditions rather than competing head-on in UPS/PDU."},"direct_competitor":{"name":"Schneider Electric","delta":"Schneider's APC/EcoStruxure covers the same rack-to-utility chain but already leads on integrated energy/infra software — the gap Vertiv is only now closing via the Waylay buy."}},"self_quality_score":{"notes":"Risk is a concrete book-to-bill threshold falsifiable at next earnings; every claim ties to a signal_id or hiring count.","originality":7,"evidence_density":9,"anti_generic_pass":true,"reverse_hype_present":true},"strategic_position":{"top_risk":"If reported backlog in Q1–Q2 2026 earnings falls below the Q3 2025 record ~$8.5B (book-to-bill <1.0), the AI-capex demand thesis underpinning the raised ~$10B FY2025 guidance is directly falsified.","their_bet":"That 800 VDC becomes the standard for 1 MW+ Rubin-class AI racks (signal 7c05d0c4), and that owning orchestration software (Waylay, 823ac77c) plus North American rack capacity (Great Lakes, 1d8de43f) locks in hyperscaler share.","what_they_do_best":"Delivering mission-critical power+thermal at frontier AI-rack density — productized 360AI reference architectures for NVIDIA GB300 NVL72 at ~142 kW/rack (signal 0a8f1612)."},"top_business_signals_90d":[{"summary":"Q3 2025 net sales rose ~29% YoY to ~$2.68B with a record ~$8.5B backlog, prompting another FY2025 guidance raise toward ~$10B.","signal_id":"c763ccd4-bbaa-40a2-b372-67dabbb8b7bb","evidence_quote":"Vertiv reported Q3 2025 net sales of roughly $2.68 billion (up about 29% year over year) and a record backlog near $8.5 billion"},{"summary":"Released 360AI power-and-cooling reference architectures for NVIDIA's GB300 NVL72 at ~142 kW/rack for MW-scale AI clusters.","signal_id":"0a8f1612-9dab-4213-87d2-324b0ff197e2","evidence_quote":"Vertiv released updated 360AI power-and-cooling reference architectures for the NVIDIA GB300 NVL72 platform, supporting roughly 142 kW per rack"},{"summary":"Acquired Belgium's Waylay NV (Dec 2025) to add AI-driven orchestration/automation software to a historically hardware-led portfolio.","signal_id":"823ac77c-4115-4faa-ab14-abad495ac273","evidence_quote":"Vertiv announced the acquisition of Belgium-based Waylay NV to strengthen its AI-driven orchestration and automation software stack"}],"top_hiring_specialties_60d":[{"job_count":2,"specialty":"UPS / critical power systems (incl. battery, commissioning)"},{"job_count":1,"specialty":"Switchgear, medium-voltage distribution & grid interconnect"},{"job_count":1,"specialty":"Liquid cooling design & thermal management"}]},"recent_business_signals":[{"signal_type":"other","signal_date":"2026-06-03","signal_data":{"event_type":"dividend_declaration","record_date":"June 15, 2026","payment_date":"June 25, 2026","dividend_type":"cash","amount_per_share":0.0625,"declaration_date":"June 3, 2026"},"source":"sec_edgar"},{"signal_type":"capacity_expansion","signal_date":"2026-04-22","signal_data":{"segment":"Consolidated","capex_usd":475000000,"product_line":null,"fiscal_period":"FY2026","capex_direction":"expand","source_filing_type":"10-Q"},"source":"sec_edgar_capex"},{"signal_type":"customer_win","signal_date":"2026-03-18","signal_data":{"customer_name":"NVIDIA reference architecture","evidence_tier":"bootstrap_curated_v1","product_or_capacity":"Liebert XDU CDU + immersion / liquid cooling reference designs","customer_canonical_id":"81a50d9f-d2b5-4c4f-a20c-6d15c44931df","bootstrap_source_label":"Vertiv news","customer_canonical_slug":"nvidia"},"source":"customer_wins_seed"},{"signal_type":"customer_win","signal_date":"2026-03-08","signal_data":{"customer_name":"Multiple hyperscalers","evidence_tier":"bootstrap_curated_v1","product_or_capacity":"Liebert UPS + Trellis power distribution for >100kW/rack AI racks","customer_canonical_id":null,"bootstrap_source_label":"Vertiv IR","customer_canonical_slug":null},"source":"customer_wins_seed"},{"signal_type":"capacity_expansion","signal_date":"2026-02-13","signal_data":{"segment":"Americas","capex_usd":110900000,"product_line":null,"fiscal_period":"FY2025","capex_direction":"expand","source_filing_type":"10-K"},"source":"sec_edgar_capex"},{"signal_type":"acquisition","signal_date":"2025-12-15","signal_data":{"target":"Waylay NV","rationale":"add AI-driven orchestration and automation software for data center power and infrastructure management","target_country":"Belgium"},"source":"ai_synthesis_sdk"},{"signal_type":"partnership","signal_date":"2025-10-28","signal_data":{"scope":"integrated power and liquid-cooling reference architecture for AI factories","partner_name":"NVIDIA","product_name":"Vertiv 360AI reference architecture for GB300 NVL72","rack_power_kw":142},"source":"ai_synthesis_sdk"},{"signal_type":"earnings","signal_date":"2025-10-22","signal_data":{"period":"Q3 2025","backlog_usd":8500000000,"revenue_usd":2680000000,"guidance_action":"raised full-year 2025 net sales guidance toward ~$10 billion","revenue_growth_yoy_pct":29},"source":"ai_synthesis_sdk"},{"signal_type":"acquisition","signal_date":"2025-10-07","signal_data":{"target":"Great Lakes Data Racks & Cabinets","rationale":"expand North American rack and integrated power/cabinet manufacturing capacity for AI infrastructure","amount_usd":200000000},"source":"ai_synthesis_sdk"},{"signal_type":"earnings","signal_date":"2025-07-30","signal_data":{"period":"Q2 2025","revenue_usd":2640000000,"guidance_action":"raised full-year 2025 net sales and adjusted EPS guidance","adjusted_eps_usd":0.95,"revenue_growth_yoy_pct":34,"fy2025_net_sales_guidance_usd":9830000000},"source":"ai_synthesis_sdk"},{"signal_type":"partnership","signal_date":"2025-05-19","signal_data":{"alignment":"next-gen NVIDIA Rubin/Kyber AI factory roadmap (2027+)","initiative":"800 VDC data center power architecture","partner_name":"NVIDIA","target_density":"1 MW+ AI racks"},"source":"ai_synthesis_sdk"}],"recent_talent_signals":[{"job_title":"Field Service Engineer, Critical Power Systems","job_level":"mid","job_specialty":["UPS systems","battery systems","commissioning"],"posted_date":"2026-05-07"},{"job_title":"Product Manager, Data Center Power Distribution","job_level":"senior","job_specialty":["busway","power distribution","rack PDU"],"posted_date":"2026-04-28"},{"job_title":"Staff Electrical Engineer, Medium Voltage Switchgear","job_level":"staff","job_specialty":["switchgear","medium voltage distribution","grid interconnect"],"posted_date":"2026-04-09"},{"job_title":"Senior Power Electronics Engineer, UPS Systems","job_level":"senior","job_specialty":["power electronics","UPS systems","inverter design"],"posted_date":"2026-03-03"},{"job_title":"Thermal Engineer, Liquid Cooling Power Systems","job_level":"mid","job_specialty":["liquid cooling design","thermal management"],"posted_date":"2026-02-20"}],"citation_url":"/companies/vertiv","last_updated":"2026-06-08T03:01:03.816+00:00","generated_at":"2026-06-11T18:24:16.226Z"}