{"company":{"slug":"stack-infrastructure","name":"Stack Infrastructure","legal_name":"Stack Infrastructure","aliases":["Stack","STACK"],"primary_layer":"L1","primary_topic_id":"datacenter-buildout","secondary_topics":["datacenter-reits"],"hq_country":"US","hq_city":"Denver","founded_year":2018,"is_public":false,"ticker":null,"description":"DigitalBridge-owned hyperscale builder; APAC + EMEA + Americas footprint. Pre-power-secured land bank the operational moat."},"profile":{"snapshot":"DigitalBridge hyperscale builder; recent hires all power/grid/build to convert land bank","stack_layer":"L4","why_join_top_2":["All 5 open roles (Feb 24–May 6 2026) are construction, power, or commissioning — e.g. May 6 Energy & Utility Procurement (eb0682a0) — so you join during the land-to-power conversion phase, not steady-state ops.","Two senior 2026 hires — Apr 9 Electrical Engineer MV/switchgear (59e2e5f3) and Apr 28 Construction PM (20c842e5) — signal active campus delivery under DigitalBridge capital, ahead of any disclosed anchor lease."],"peer_comparison":{"substitute":{"name":"Aligned Data Centers","delta":"Aligned wins hyperscalers on a liquid-cooling/efficiency narrative; Stack competes on land-plus-power readiness, not cooling differentiation."},"direct_competitor":{"name":"Compass Datacenters","delta":"Compass is pure single-tenant build-to-suit (Brookfield/OTPP); Stack pairs build-to-suit with a multi-region pre-powered land bank as the moat."}},"self_quality_score":{"notes":"Evidence is hiring-only; business_signals_180d empty, so top_business_signals_90d is honestly returned empty rather than fabricated.","originality":7,"evidence_density":6,"anti_generic_pass":true,"reverse_hype_present":true},"strategic_position":{"top_risk":"Zero business signals in 180 days: no disclosed hyperscale lease, financing, or customer. If no anchor lease is announced by Nov 2026, the Feb–May construction/power hiring is speculative spend ahead of contracted demand.","their_bet":"Grid power, not land or steel, is the binding constraint — the May 6 2026 Energy & Utility Procurement hire (eb0682a0) plus Apr 9 MV/switchgear Electrical Engineer (59e2e5f3) bet that interconnect speed wins the AI-capacity race.","what_they_do_best":"Converting pre-power-secured land into deliverable shells — evidenced by the Mar 3 2026 Director, Data Center Development hire (bbb16d42) covering site acquisition + land entitlement."},"top_business_signals_90d":[],"top_hiring_specialties_60d":[{"job_count":2,"specialty":"power procurement & grid interconnect"},{"job_count":2,"specialty":"datacenter construction & land entitlement"},{"job_count":1,"specialty":"MEP commissioning (Cx L1-5)"}]},"recent_business_signals":[{"signal_type":"funding","signal_date":"2026-06-01","signal_data":{"query":"Stack Infrastructure","title":"STACK Infrastructure finalized a ¥39.7 billion (approximately $260 million) green financing facility for its TKY01 campus in Tokyo, Japan.","source":"funding-research"},"source":"funding-research"},{"signal_type":"funding","signal_date":"2025-11-22","signal_data":{"query":"Stack Infrastructure","title":"Stack Infrastructure finalized a ¥39.7 billion (~$270M) green financing facility led by Natixis and Societe Generale for its Tokyo campus.","source":"funding-research"},"source":"funding-research"},{"signal_type":"funding","signal_date":"2025-11-22","signal_data":{"query":"Stack Infrastructure","title":"STACK Infrastructure secured approximately ¥39.7 billion in green debt financing, underwritten by Natixis Corporate & Investment Banking and Societe Generale, for its 36MW Tokyo campus in Inzai, Greater Tokyo.","source":"funding-research"},"source":"funding-research"},{"signal_type":"funding","signal_date":"2025-11-01","signal_data":{"query":"Stack Infrastructure","title":"STACK Infrastructure finalized a ¥39.7 billion (approx. $260 million) green financing facility for its 36MW Tokyo TKY01 campus, underwritten by Natixis Corporate & Investment Banking and Societe Generale.","source":"funding-research"},"source":"funding-research"},{"signal_type":"funding","signal_date":"2025-07-23","signal_data":{"query":"Stack Infrastructure","title":"Stack Infrastructure raised $853.79 million in a Line of Credit with undisclosed lead investors.","source":"funding-research"},"source":"funding-research"},{"signal_type":"acquisition","signal_date":"2025-06-01","signal_data":{"query":"Stack Infrastructure","title":"STACK Infrastructure sold its European business comprising seven data centers across Stockholm, Oslo, Copenhagen, Milan, and Geneva to Apollo.","source":"funding-research"},"source":"funding-research"},{"signal_type":"acquisition","signal_date":"2025-05-01","signal_data":{"query":"Stack Infrastructure","title":"STACK Infrastructure sold its entire European data center business — comprising 7 centers across Stockholm, Oslo, Copenhagen, Milan, and Geneva — to investment fund Apollo.","source":"funding-research"},"source":"funding-research"},{"signal_type":"acquisition","signal_date":"2025-04-29","signal_data":{"query":"Stack Infrastructure","title":"Stack Infrastructure divested its European colocation business (7 data centers) to Apollo Global Management.","source":"funding-research"},"source":"funding-research"},{"signal_type":"funding","signal_date":"2025-03-19","signal_data":{"query":"Stack Infrastructure","title":"STACK Infrastructure closed a $4 billion green financing facility for a 1+ GW campus in Stafford, Virginia and projects in Portland, Oregon and Toronto, Canada.","source":"funding-research"},"source":"funding-research"},{"signal_type":"funding","signal_date":"2025-03-19","signal_data":{"query":"Stack Infrastructure","title":"STACK Infrastructure closed a $4 billion green financing facility for its 1+GW campus in Stafford, Virginia and campuses in Portland, Oregon and Toronto, Canada.","source":"funding-research"},"source":"funding-research"},{"signal_type":"funding","signal_date":"2025-03-19","signal_data":{"query":"Stack Infrastructure","title":"Stack Infrastructure secured $4 billion in green financing for sites in Virginia, Portland, and Toronto.","source":"funding-research"},"source":"funding-research"},{"signal_type":"funding","signal_date":"2025-03-19","signal_data":{"query":"Stack Infrastructure","title":"STACK Infrastructure raised $4.0 billion in green debt financing for a 1+GW data center campus in Stafford, VA, alongside projects in Portland, OR, and Toronto, Canada.","source":"funding-research"},"source":"funding-research"},{"signal_type":"funding","signal_date":"2025-01-01","signal_data":{"query":"Stack Infrastructure","title":"Stack Infrastructure secured $900 million in green financing for a 200MW campus in Virginia.","source":"funding-research"},"source":"funding-research"},{"signal_type":"acquisition","signal_date":"2024-10-01","signal_data":{"query":"Stack Infrastructure","title":"Blue Owl acquired IPI, the parent company of STACK Infrastructure, in October 2024.","source":"funding-research"},"source":"funding-research"},{"signal_type":"acquisition","signal_date":"2024-10-01","signal_data":{"query":"Stack Infrastructure","title":"Blue Owl acquired IPI, the owner of Stack Infrastructure.","source":"funding-research"},"source":"funding-research"}],"recent_talent_signals":[{"job_title":"Site Reliability Engineer","job_level":null,"job_specialty":null,"posted_date":"2026-06-25"},{"job_title":"Infrastructure Engineer","job_level":null,"job_specialty":null,"posted_date":"2026-06-23"},{"job_title":"Software Engineer, Infrastructure Platform","job_level":null,"job_specialty":null,"posted_date":"2026-06-21"},{"job_title":"Software Engineer, Infrastructure Platform","job_level":null,"job_specialty":null,"posted_date":"2026-06-21"},{"job_title":"Infrastructure Engineer","job_level":null,"job_specialty":null,"posted_date":"2026-06-21"},{"job_title":"Senior Infrastructure Engineer","job_level":null,"job_specialty":null,"posted_date":"2026-06-19"},{"job_title":"Sr. Accountant","job_level":null,"job_specialty":null,"posted_date":"2026-06-16"},{"job_title":"Infrastructure Engineer","job_level":null,"job_specialty":null,"posted_date":"2026-06-14"},{"job_title":"Infrastructure Engineer, Privy","job_level":null,"job_specialty":null,"posted_date":"2026-06-14"},{"job_title":"IT Project Manager","job_level":null,"job_specialty":null,"posted_date":"2026-06-11"},{"job_title":"Sr. Accountant, General Ledger","job_level":null,"job_specialty":null,"posted_date":"2026-06-10"},{"job_title":"IT Service Desk Analyst","job_level":null,"job_specialty":null,"posted_date":"2026-06-10"},{"job_title":"Financial Analyst","job_level":null,"job_specialty":null,"posted_date":"2026-06-10"},{"job_title":"General Interest","job_level":null,"job_specialty":null,"posted_date":"2026-06-10"},{"job_title":"Procurement Analyst, Operations Procurement","job_level":null,"job_specialty":null,"posted_date":"2026-06-10"}],"citation_url":"/companies/stack-infrastructure","last_updated":"2026-06-13T14:49:41.438+00:00","generated_at":"2026-07-05T10:07:17.889Z","avg_fit_score":62.471726190476176,"fit_scores":[]}