{"company":{"slug":"bloom-energy","name":"Bloom Energy","legal_name":"Bloom Energy Corporation","aliases":["Bloom","BE"],"primary_layer":"L1","primary_topic_id":"datacenter-power","secondary_topics":null,"hq_country":"US","hq_city":"San Jose","founded_year":2001,"is_public":true,"ticker":"BE","description":"Solid-oxide fuel-cell power systems. AI-datacenter angle: on-site behind-the-meter generation that bypasses 5-7yr grid interconnect queues. Named in 2025-2026 hyperscaler PPA announcements."},"profile":{"snapshot":"Solid-oxide fuel-cell on-site power for AI data centers; FY2025 revenue ~$1.9B","stack_layer":"L1","why_join_top_2":["Revenue scaled from $326M in Q1 2025 (a571fda2) to ~$1.9B FY2025 (41044b02), beating the $1.65-1.85B guidance—genuine demand inflection, not a pitch.","Brookfield's up-to-$5B October 2025 commitment (2b1a430b) plus 2026 hiring on grid interconnect (2 reqs) and data center power signals a multi-year deployment build-out."],"peer_comparison":{"substitute":{"name":"Generac","delta":"Generac gas/diesel gensets are the cheaper standby substitute; Bloom positions as cleaner continuous primary power, not 99.999% backup."},"direct_competitor":{"name":"GE Vernova","delta":"GE Vernova sells dispatchable gas turbines for the same 'bypass-the-interconnect' hyperscaler power need; Bloom counters with modular fuel cells deployable in ~90 days (17af21a6)."}},"self_quality_score":{"notes":"Top risk is Oracle-concentration, falsifiable at Q3 2026 earnings.","originality":8,"evidence_density":9,"anti_generic_pass":true,"reverse_hype_present":true},"strategic_position":{"top_risk":"Revenue is concentrated in the Oracle relationship; if no second named hyperscaler/data-center PPA is announced by Q3 2026 earnings, the Brookfield $5B pipeline thesis looks unconverted.","their_bet":"Behind-the-meter fuel cells become the default fast power for AI clusters, underwritten by Brookfield's up-to-$5B financing vehicle (2b1a430b) scaling deployment beyond Bloom's own balance sheet.","what_they_do_best":"Delivering fast on-site primary power: the Oracle deal (17af21a6) cites fuel cells deployable within ~90 days versus multi-year grid interconnect queues."},"top_business_signals_90d":[{"summary":"FY2025 revenue reached ~$1.9B, above the prior $1.65-1.85B guidance, on record data-center fuel-cell deployments.","signal_id":"41044b02-1474-49ff-b957-8f1673479c8a","evidence_quote":"full-year 2025 revenue of approximately $1.9 billion, reflecting record annual deployments of on-site fuel-cell power"},{"summary":"Brookfield committed up to $5B to finance and deploy Bloom fuel-cell platforms for AI/data-center customers worldwide.","signal_id":"2b1a430b-a3a8-441b-ae07-f02168962a54","evidence_quote":"Brookfield committed up to $5 billion to finance and deploy Bloom's fuel-cell power platforms for AI and data center customers"},{"summary":"Oracle deal positions Bloom fuel cells as ~90-day on-site primary power for OCI AI data centers, bypassing grid queues.","signal_id":"17af21a6-27e4-4a9c-937c-52f5eea6d0ec","evidence_quote":"deploy its solid-oxide fuel cell platform as on-site primary power for Oracle Cloud Infrastructure data centers"}],"top_hiring_specialties_60d":[{"job_count":2,"specialty":"grid interconnect"},{"job_count":1,"specialty":"data center power"},{"job_count":1,"specialty":"fuel cell stack"}]},"avg_fit_score":69.6524064171123,"fit_scores":[{"overall_score":68.7272727272727,"growth_score":80,"comp_score":null,"learning_score":72,"stability_score":55,"culture_score":null,"jobseeker_profile_id":"2b02566c-298b-4187-9083-1903776beacc"},{"overall_score":71.8,"growth_score":82,"comp_score":null,"learning_score":75,"stability_score":55,"culture_score":60,"jobseeker_profile_id":"978b5f82-0a68-4278-b180-4b0cfb1202a9"},{"overall_score":66.2,"growth_score":80,"comp_score":null,"learning_score":72,"stability_score":55,"culture_score":null,"jobseeker_profile_id":"8a7b600b-b6be-44a8-b66e-3548cbc39b90"},{"overall_score":71.8823529411765,"growth_score":80,"comp_score":null,"learning_score":72,"stability_score":55,"culture_score":60,"jobseeker_profile_id":"cf9cb948-c0e4-48f3-8364-e1c234a9cd11"}],"recent_business_signals":[{"signal_type":"earnings","signal_date":"2026-02-12","signal_data":{"period":"Q4 2025 / FY2025","report_type":"annual_and_quarterly_earnings_release","fy2025_revenue_usd_approx":1900000000},"source":"ai_synthesis_sdk"},{"signal_type":"earnings","signal_date":"2025-11-05","signal_data":{"note":"Record quarterly revenue and reaffirmed/raised full-year outlook","period":"Q3 2025","report_type":"quarterly_earnings_release","fy2025_revenue_guidance_usd_range":[1650000000,1850000000]},"source":"ai_synthesis_sdk"},{"signal_type":"partnership","signal_date":"2025-10-13","signal_data":{"use_case":"Funding and deploying Bloom fuel-cell power platforms for AI data centers globally","structure":"Strategic financing/deployment partnership","partner_name":"Brookfield Asset Management","commitment_usd":5000000000},"source":"ai_synthesis_sdk"},{"signal_type":"earnings","signal_date":"2025-07-31","signal_data":{"period":"Q2 2025","report_type":"quarterly_earnings_release","revenue_usd":401200000,"yoy_revenue_growth_pct":19.5},"source":"ai_synthesis_sdk"},{"signal_type":"partnership","signal_date":"2025-07-15","signal_data":{"use_case":"On-site fuel-cell power for Oracle Cloud Infrastructure (OCI) AI data centers","partner_name":"Oracle","deployment_speed":"Fuel-cell power capable of being deployed within ~90 days of a site decision"},"source":"ai_synthesis_sdk"},{"signal_type":"earnings","signal_date":"2025-05-01","signal_data":{"period":"Q1 2025","report_type":"quarterly_earnings_release","revenue_usd":326000000,"yoy_revenue_growth_pct":38.6},"source":"ai_synthesis_sdk"}],"recent_talent_signals":[{"job_title":"Staff Systems Engineer, Microgrid and Grid Integration","job_level":"staff","job_specialty":["grid interconnect","microgrid controls"],"posted_date":"2026-05-07"},{"job_title":"Field Service Engineer, Energy Systems","job_level":"mid","job_specialty":["field service","power generation commissioning"],"posted_date":"2026-04-28"},{"job_title":"Solid Oxide Fuel Cell Stack Engineer","job_level":"mid","job_specialty":["fuel cell stack","electrochemistry"],"posted_date":"2026-04-09"},{"job_title":"Senior Power Electronics Engineer, Energy Server","job_level":"senior","job_specialty":["power electronics","inverter design"],"posted_date":"2026-03-03"},{"job_title":"Director, Data Center Power Solutions","job_level":"director","job_specialty":["data center power","grid interconnect"],"posted_date":"2026-02-25"}],"citation_url":"/companies/bloom-energy","last_updated":"2026-05-14T14:33:37.941141+00:00","generated_at":"2026-05-19T12:02:11.952Z"}